Digital Infrastructure stories
Geopolitical risks are prompting chipmakers to spread production across Asia Pacific, with 35% planning expansion into new regional markets.
Despite pay rises, 38.8% of European and 37.8% of US permanent data centre staff expect to switch employers within a year.
The enlarged consultancy now has more than 100 staff and a stronger London base as demand rises for data centre and lower-carbon projects.
Rising demand for AI cooling is pushing the Korean group to add capacity in Virginia and South Korea with KRW 150 billion of investment.
Encrypted data captured today could be cracked later, leaving governments, banks and health services exposed unless they migrate before quantum computers arrive.
The accreditation gives government and regulated buyers independent assurance that the VSP One Block platform has met recognised security requirements.
Rising AI-driven demand is forcing the data-centre supplier to scale factories and logistics as Michael Resha takes over operations leadership.
The launch aims to bridge a widening leadership gap as digital infrastructure projects grow faster than the people expected to run them.
Data centre operators are under pressure to supply their own electricity, opening the door for Honeywell to add on-site power and utilities.
The project aims to keep vital networks running through cyberattacks and outages by adding post-quantum security to eSIM and iSIM systems.
The build aims to ease capacity shortages for AI traffic and trans-Pacific data flows, with installation due over just over three years.
The 1GW scheme could bring 750 construction jobs and 450 permanent roles to a former nuclear site near Annan if approved.
The tie-up could simplify venue design across Southeast Asia by pairing lighting and audio, with pilot projects due in its first 180 days.
Only 31% of Australian businesses have a central view of AI agents, raising concerns over security gaps as Elastic rolls out new tools.
Zoho Canada's Gary Yorke says municipalities need departments to share a directory and data infrastructure to make AI work for residents.
With 12% of respondents scammed last year, the GSMA says faster case resolution and stronger digital trust are vital for India's next growth phase.
The feasibility work could shape whether a proposed Ho Chi Minh City campus gets built, with connectivity now a key factor for investors.
Vietnam's expanding property market has helped JLL build a 350-strong local team, with industrial, logistics and data centres now driving demand.
The tie-up could help data centre builders in South Korea source cabling, connectors and power systems from one supplier group.
Operators say faster planning and lower spectrum costs could unlock billions for 5G rollouts and improve coverage across the UK.