Asset Management stories
The government’s plan could cut household costs, but councils fear losing control over water assets as a 30-year fix is pursued.
Poor maintenance is costing firms billions through outages, water failures and transport disruptions, the G20 says in a new policy agenda.
Roads will stay battered without sustained upkeep, despite a bigger funding package that lifts maintenance and safety spending across the network.
Passengers will get a new rail operator next January after Auckland Transport awarded an eight-year, NZD $130 million-a-year deal to Auckland One Rail.
Projects that kept ferries running, roads safer and power supply secure were among the winners at Civil Contractors New Zealand’s awards in Wellington.
New Zealand faces a $20 billion infrastructure deficit, with industry groups urging a long-term pipeline and more maintenance.
Downtime and lost revenue can still hit automated warehouses without on-site teams to fix faults fast and plan preventative maintenance.
Delays and cost overruns in New Zealand infrastructure could ease if owners and contractors shared risk and data, Rob Bryant says.
Older spans are under fresh scrutiny as Australasia’s 57,000-plus bridges face heavier traffic, climate stress and overdue maintenance.
Digital twin tools could help cut costly delays and emissions, as 90% of infrastructure projects are still late or over budget.
Up to 30 percent of Wellington’s drinking water is lost to leaks, prompting a unanimous council push for urgent infrastructure upgrades.
Health and sanitation in many communities could be put at risk as sea-level rise and heavier rain strain wastewater systems.
Construction firms could cut costs and delays by using digital replicas to spot failures, test designs and improve sustainability before build-out.
Lockdowns have exposed costly staffing risks in water and wastewater plants, strengthening the case for remote monitoring and automation.
Corrosion-free reinforcement is gaining traction as engineers seek lower maintenance costs and longer-lasting bridges, seawalls and dams.
Councils face pressure to back long-delayed water reforms as NZD $761 million in funding is tied to fixing ageing networks and service failures.
Hospitals need GBP £14 billion over the next decade to fix ageing assets and close major infrastructure gaps, the report says.
Regional blocs and national champions could leave infrastructure slower to innovate, more monopolistic and less resilient as climate risks mount.
Bridge checks could become cheaper and more consistent as Waterloo researchers use autonomous robots, cameras and lidar to spot defects.
Tecala, an Australian tech services provider, talks about its primary focuses, solutions, and resources in the ANZ market.